solution Use Case

Grass Valley AMPP – Production Scheduling & Orchestration

GrassValley

At NAB 2025, we showcased our latest integration with Grass Valley AMPP: managing the lifecycle of GV AMPP productions and orchestrating not only all your GV AMPP workloads, but also third-party and offline resources such as people or rooms. Here are the five things we do:

  1. Open the DataMiner Scheduling app to prepare your production: pick the resources you need, either one by one or by selecting a template.
  2. DataMiner allocates resources for the upcoming production from resource pools; either fully automated or manually selected by an operator.
  3. Before the production starts, DataMiner deploys the GV AMPP workloads, configures them, and connects the signals between them. The same applies to any other third-party resources, including ingress and egress signals.
  4. While the production is running, DataMiner monitors the production and all resources, offering tailored user interfaces for real-time control.
  5. At the end of the production, DataMiner undeploys all resources and releases them back into the pool. Additionally, it calculates the production costs using rate cards attached to each resource.

With that in place, you only pay for the GV AMPP resources during the production—DataMiner ensures they’re spun up and down at the right time.

Wondering how we do this? The foundation is our latest GV AMPP connector, combined with our dataminer.MediaOps solution, which includes pre-configured user interfaces, workflows, and a standard data model to manage all production data.

2 thoughts on “Grass Valley AMPP – Production Scheduling & Orchestration

  1. Gelber Mahecha

    Great post, Thomas! DataMiner is unlocking a wide range of orchestration possibilities ranging from full automated configuration to custom interfaces that allow users to perform a series of actions with the click of a button.

Leave a Reply